|
||||||||||
|
||||||||||
About Us |
Contact Us |
Ordering |
Can We Help |
delivery |
terms & Conditions |
ALL Radiators
|
The DRESSER
|
The RUSKIN
|
The PUGIN
|
The PAXTON
|
The MORRIS |
Paint and Effects
|
Valves |
|||
The KNOX
|
The MACINTOSH
|
The BURGES
|
The CUBIT
|
Towel Rails |
. Tel...... : .01749 880 384............
|
Orders, Delivery & Installation |
Ordering and Delivery and Installation
Southern Cast Radiators offer a 16 day lead time from order for custom painted orders and 21 days for polished orders.
We WILL will try and get an order to you as soon as possible if your lead time is short.
All Southern Cast Radiators products are custom built to your requirements and pressure tested before delivery.
Once your customized order is near completion we will contact you via email or telephone to organise a convenient delivery date with you.
Take Advantage Of Our Current Offers Now If you are planning your installation some months ahead and wish to place an order, we will store your order and deliver to coordinate with your plumbing installation.
We deliver cast iron radiators to the UK, Europe and Worldwide.
Delivery is free of charge into our LOCAL Zones / or / your order is over £1000 if you are on mainland Britain.
Export orders are quoted for delivery once we have the size and weight of the order, we then organise shipping to your destination.
An appointment is required for collection, please telephone 01749 880 384 to arrange a mutually convenient appointment time.
Payment for your order can be made by cheque or by Google Invoice.
INSTALLATION Help
Handling Advice
Please refer to the handling guidelines that are supplied with this
product. This gives important information about the safe lifting of these radiators
to minimise risk and damage.
Water Treatment
These products are for use on closed heating systems only; they are not
suitable for installation on secondary HWS circuits.
Treatments and installation
On completion of the installation the entire system MUST be thoroughly cleaned
and flushed to remove debris/flux residues etc. If a chemical cleanser is used, it
must be thoroughly flushed from the system. Following this, the system MUST
be dosed with FRENOX F1 SC water treatment to prevent corrosion. System
design, flushing and dosing must be in accordance with BS 5449: 1990, BS EN
12828: 2003 and BS 7593: 1992.
IMPORTANT: Failure to observe these requirements will render the guarantee on
the product void.
Corrosion inhibitor must be used in accordance with the manufacturer’s
instructions and recommendations and should take into account the particular
metals within the system.
Aeration should be avoided
Cleaning & Aftercare
The external surface of the radiator should be cleaned with mild detergent.
No solvents or abrasives should be used.
Painting/Coatings
If they were supplied in primer finish, they can be covered with a variety of
paint types including water-based, oil-based, cellulose, 2-pack acrylic and stove
enamel.
These radiators may have been supplied factory painted in your choice
of colour. If so, no further painting or surface treatment is necessary or
recommended. Always consult the paint manufacturers guidance & instructions
DO NOT POWDER-COAT THIS PRODUCT
Operating Pressure
Maximum 6 bar
Warranty & further information
These radiators have been designed, manufactured and tested to ensure a
long-lasting use. Should you require any further information, help or advice, or
have any difficulties with these products or their installation and use, please
contact our office on:
Tel: 01749 880 384
Web: www.southerncastradiators.co.uk